Northern Division Overtaking Opportunities - Portrush Road Roundabout DALs

Scheme signboard

Newbridge Road exit (towards Coleraine)

Overall length:0.4 kilometres
Overtaking Length:                              0.3 kilometres
Cost:£0.1 million
Type:Differential Acceleration Lane
Contract:Traditional Consultant Design Contractor Build
Contractor:Kennedy Quarries
Status:Open to traffic July 2001

The differential acceleration lane widened the A26 Newbridge Road to create an overtaking opportunity for northwest bound traffic departing the Portrush Road Roundabout. The online improvement symmetrically widened the existing road to 12 metres and is marked as two lanes (3.2 metre wide nearside lane and 3.4 metre wide overtaking lane)  towards Coleraine and one lane (3.4 metres wide) towards the roundabout, with opposing traffic streams separated by a double white line system. The running carriageway is flanked either side by 1 metre wide edge strips. The DAL terminated before the existing Seacon Road ghost island junction. Two new 25 metre long by 3.5 metre wide lanes increased the capacity of the approach to the Portrush Road Roundabout.

Frosses Road exit (towards Ballymena)

Overall length:0.6 kilometres
Overtaking Length:                              0.4 kilometres
Cost:£0.1 million
Type:Differential Acceleration Lane
Contract:Traditional Consultant Design Contractor Build
Contractor:Kennedy Quarries
Status:Open to traffic:July 2001

The differential acceleration lane widened the A26 Frosses Road to create an overtaking opportunity for southwest bound traffic departing the Portrush Roadr Roundabout. The online improvement symmetrically widened the existing road to 12 metres and is marked as two lanes (3.2 metre wide nearside lane and 3.4 metre wide overtaking lane)  towards Ballymena and one lane (3.4 metres wide) towards the roundabout, with opposing traffic streams separated by a double white line system. The running carriageway is flanked either side by 1 metre wide edge strips. The DAL terminated before a new ghost island junction provided to promote safe right turns into the Greenhill Road. Two new 30 metre long by 3.5 metre wide lanes increased the capacity of the approach to the Portrush Road Roundabout.

Photo gallery

(click on thumbnail to enlarge)

Before construction

Location on Northern Key Transport Corridor

Completed scheme

Ballymena bound exit after construction of DAL    Coleraine bound exit after construction of DAL    Portrush Road Roundabout DAL - roundabout exit towards Ballymena    Portrush Road Roundabout DAL - roundabout exit towards Coleraine